Page 18 - FDS Annual Report 2012
P. 18
ANNUAL REPORT 2012
16 FOREST DEPARTMENT SARAWAK
Table 6: Revenue Collected from National Parks, Nature Reserves and Wildlife Centres
No. Station PTJ Code Total (RM)
1 Taman Negara Mulu 3504112 1,237,524.45
2 Taman Negara Bako 3501109 710,120.00
3 Pejabat Tempahan Taman Negara Kuching 3501209 349,855.00
4 Taman Negara Gua Niah 3504114 354,109.00
5 Semenggoh Nature Reserve 3501228 497,863.00
6 Taman Negara Similajau 3509116 230,439.00
7 Taman Negara Lambir 3504113 215,109.00
8 Taman Negara Gunung Gading 3501220 158,522.00
9 Pusat Hidupan Liar Matang 3501110 169,679.00
10 Samajaya Nature Reserve 3501227 113,738.00
11 Taman Negara Kubah 3504115 93,602.00
12 Wind/Fairy Caves Nature Reserve 3501229 22,786.00
13 Taman Negara Logan Bunut 3504211 13,808.00
14 Taman Negara Tanjung Datu 3501230 4,961.00
15 Taman Negara Batang Ai 3502219 814.00
16 Taman Negara Talang Satang 3501235 10,240.00
17 Taman Negara Maludam 3502237 0.00
18 Pejabat Tempahan Taman Negara Miri 3504210 0.00
19 Pejabat Taman Negara Limbang 3505212 0.00
Grand Total 4,183,169.45
Log Production
3
Log production during the year was 9,458,564 m , registering a marginal decline of 1.6% relative to
3
total log production in the previous year (9,610,434 m ). Pole production under category (P30) also
indicated a decline from 1,665,647 pieces (2011) to 1,373,769 pieces or by 21%. The decline in log
and pole production was due to reduction in size of production areas or harvestable forest area.
16 | P a g e
16 FOREST DEPARTMENT SARAWAK
Table 6: Revenue Collected from National Parks, Nature Reserves and Wildlife Centres
No. Station PTJ Code Total (RM)
1 Taman Negara Mulu 3504112 1,237,524.45
2 Taman Negara Bako 3501109 710,120.00
3 Pejabat Tempahan Taman Negara Kuching 3501209 349,855.00
4 Taman Negara Gua Niah 3504114 354,109.00
5 Semenggoh Nature Reserve 3501228 497,863.00
6 Taman Negara Similajau 3509116 230,439.00
7 Taman Negara Lambir 3504113 215,109.00
8 Taman Negara Gunung Gading 3501220 158,522.00
9 Pusat Hidupan Liar Matang 3501110 169,679.00
10 Samajaya Nature Reserve 3501227 113,738.00
11 Taman Negara Kubah 3504115 93,602.00
12 Wind/Fairy Caves Nature Reserve 3501229 22,786.00
13 Taman Negara Logan Bunut 3504211 13,808.00
14 Taman Negara Tanjung Datu 3501230 4,961.00
15 Taman Negara Batang Ai 3502219 814.00
16 Taman Negara Talang Satang 3501235 10,240.00
17 Taman Negara Maludam 3502237 0.00
18 Pejabat Tempahan Taman Negara Miri 3504210 0.00
19 Pejabat Taman Negara Limbang 3505212 0.00
Grand Total 4,183,169.45
Log Production
3
Log production during the year was 9,458,564 m , registering a marginal decline of 1.6% relative to
3
total log production in the previous year (9,610,434 m ). Pole production under category (P30) also
indicated a decline from 1,665,647 pieces (2011) to 1,373,769 pieces or by 21%. The decline in log
and pole production was due to reduction in size of production areas or harvestable forest area.
16 | P a g e

