Page 16 - Swb_2016
P. 16
12. Contract no. sWB/CT/19/2014 The supply, delivery and Commissioning of Pilot operated
Pressure reducing Valves (Full Bore) and The associated accessories for sWB (nrW)

Contract Sum : RM342,200.00
Date of Commencement : 01.10.2014
Date of Practical Completion : 25.03.2015
Contractor : Coast Enterprise (S)
Sdn. Bhd.

Expiry Date of Defects Liability Period : 24.03.2017




13. Contract no. sWB/CT/21/2014 The supply of Labours, Transports, Tools and Equipment to
assist In Installation of Electromagnetic Flow Meter/Insertion Probe Meters, Pressure reducing
Valve c/w Concrete Chamber/Meter Bridge and Isolation Valves Cum ancillary Works within
sibu Water Board supply area (nrW)
Contract Sum : RM534,380.00
Date of Commencement : 13.10.2014
Date of Practical Completion: 12.01.2016
Contractor : Coast Enterprise (S)
Sdn. Bhd.
Expiry Date of Defects Liability Period : 11.07.2016





14. Contract no. sWB/CT/26/2014 Upgrading to automatic Change over operation for Chemical
Treatment system and Treated Water Pumps in Pump house during sEsCo Power Interruption
by adding Pumpsmart to Treated Water Pump P7, P8 & P9 in Pump house 2, salim Treatment
Plant
Contract Sum : RM1,260,000.00
Date of Commencement : 01.01.2015
Date of Practical Completion : 31.10.2015
Contractor : Group Engineers Malaysia
Sdn. Bhd.
Expiry Date of Defects Liability Period : 30.10.2016





15. Contract no. sWB/CT/27/2014 The delivery and Laying of 250mm d.I. Mains, Valves, Fittings
Cum ancillary Works and Patching of Concrete asphalt at Jalan Ling Chu Ming (From sibu
West Booster station to Jalan Empawah)

Contract Sum : RM398,216.00
Date of Commencement : 19.01.2015
Date of Practical Completion : 31.10.2015
Contractor : HK Engineering
Expiry Date of Defects Liability Period : 30.10.2016






14 Sibu Water board
   11   12   13   14   15   16   17   18   19   20   21